IMPORTANT
Complete all forms under this appendix for each
unit and email, fax or mail to Venmar CES imme-
diately after start-up to validate warranty and to
provide valuable information for personnel perform-
ing future maintenance or for factory assistance to
address below.
Read the Installation, Operation and Maintenance
Instruction Manual and the Venmar CES Control
System Keypad Operation Guide and the Sequence
of Operation before proceeding.
Leave a copy of this report with the owner and at
the unit for future reference and permanent record.
To ensure proper operation of each unit, qualified
personnel should perform the start-up, complete
the checklist and report.
All units are functionally tested except when
shipped in multiple pieces. Start-up adjustments
may be required. If the unit is shipped as a single
piece, blowers, enthalpy wheel and compressors (if
equipped) are set up to run correctly when power
is connected. If any blower is running backwards
or compressor is making loud noises, disconnect
power and switch two leads (on three-phase power)
to ensure proper rotation and avoid damage.
If units are equipped with compressors, power must
be turned on for 24 hours prior to a call for cool-
ing, for the compressor crank case heaters to be
energizing to prevent possible damage.
The Bacview keypad located at the control panel
will allow for manual override for start-up, mode
of operation selection and includes an internal time
clock if remote interlocks are not provided.
VCES-ASTON-SF-1B – EnergyPack, ERV5000–10000, HRV3000–10000 Start-up Form January 2014
EnergyPack
®
, ERV5000–10000(i/e) and HRV3000–10000(i/e)
Start-up Form and Checklist
Venmar CES Inc.
200 Rue Carter
St. Léonard d’Aston, QC
Canada J0C 1M0
Email to tech support: [email protected]
Fax: 899-319-2612
Phone: 1-866-4-VENMAR
Unit Identification Information
Project ____________________________________________
Job Name _________________________________________
Job Address
__________________________________________________
__________________________________________________
__________________________________________________
Model Number _____________________________________
Serial Number ______________________________________
Tag ______________________________________________
Jobsite Contact ____________________________________
Email _____________________________________________
Telephone _________________________________________
Seitenansicht 0
1 2 3 4 5 6 7 8

Inhaltsverzeichnis

Seite 1 - Start-up Form and Checklist

IMPORTANT• Complete all forms under this appendix for each unit and email, fax or mail to Venmar CES imme-diately after start-up to validate warranty

Seite 2

Serial Number: _____________________________________Table E1: Pre Start-up ChecklistChecklist Item Check √ N/A1 Check the electrical disconnect set to

Seite 3 - Table E2: Start-up Checklist

Table E1: Pre Start-up ChecklistChecklist Item Check √ N/A12Check the heat pipe fins for any fin defects from shipping or installation.a. Remove retain

Seite 4

Table E2: Start-up ChecklistChecklist Item Check √ N/A10Recheck the voltage at the disconnect switch against the nameplate and against phase-to-phase

Seite 5 - Start-up Readings

Start-up Readings• Allow unit to reach steady state before taking readings.• Complete based on options included with unitNameplate voltageInput volt

Seite 6

Serial Number: _____________________________________Table E6: Start-up Readings – CompressorsFull Load Amps (Nameplate Amps)Amp DrawAfter compressor h

Seite 7

Table E7: Start-up Readings – WSHPWaterside Cooling Mode Waterside Heating ModeEntering Temp. (°F/°C)Leaving Temp. (°F/°C)Temp. Difference (°F/°C)Ente

Seite 8 - Start-up

Serial Number: _____________________________________This unit has been checked out and started according with the above procedures and completed forms